NMRA Recommended Practices

Real Men Don’t Read NMRA’s Recommended Practices

From Jay Beckham

In 2000 I changed from HO to O scale. In HO a 36-inch minimum radius was a nice-looking curve. I  figured that 50-inch would be fine for O scale, particularly since I was modeling the South Shore which was an interurban line. I also did not consider that if I found a Little Joe it would require a larger radius because of its two eight-wheel trucks. But real men don’t read NMRA’s Recommended Practices (RP).

Now, jump forward 20 years to modeling the PRR’s Northern Central branch from Baltimore to Harrisburg, and the recent purchase of two PRR EMD E8 units. These engines have all-wheel pick-ups and are close-coupled. They run poorly on my curves. Then I added some 80-foot passenger cars, and the derailing began. My disregard for radius had come back to bite me.

According to the NMRA Recommended Practices, six-wheel trucks and 80-foot cars require a 58-inch minimum radius. Due to existing constraints, I am compromising with a 60-inch minimum. The RP also recommends a #6 switch. I have dozens of Atlas #5s. Fortunately, when I built the Penn Station area, I had laid large radius curves. I did the same at the site of my northbound staging representing the New York area.

The worst area (above) is that area previously known as Warren’s Gap. The inside track was 49” radius and the outside track 53” radius. So, I removed the track and roadbed and rebuilt that area with the inside track at 60” and the outside track at 64”.

This will become New Freedom with a small town (above), a business or two, plus the PRR passenger station.

A second area (above) had a pocket track leftover from South Shore days and because of the switch and pocket track, there was an “S” curve of about 48” radius.

I removed the switch and the pocket track  (above) to eliminate that problem.

Another major area that requires widening (above) is the area entering Baltimore. It includes an Atlas double track truss bridge. The approaches to the bridge in both directions varied from 48” to 60”. I am still in the process of removing the old track and extending the benchwork (below) about 3-4 inches to allow for 60” and 64” standards.

I am not sure if the bridge will still fit so the tracks at the end of the bridge (left) may need to be re-laid to 60” radius. The photo shows the tracks before being enclosed by a tunnel.

There are many more areas on the layout that may require radius corrections. They will be addressed in the coming months. I plan to build #6 switches using Fast Tracks and replace all my Atlas #5 switches. The nickel-silver plating is wearing off most of those switches anyway, and a #5 is below the recommended practices. In addition, the frogs are very difficult to solder leads to for powering.

So, what have I learned in this process? Standards and recommended practices have a purpose. My advice is to do your homework. Pay attention to what others say and have experienced. You may be able to apply their methods to your work.

After building a large layout I feel I could write a book about things to do and not to do.

Consider layout height so you can sit underneath to work on switches and wiring. Consider sectional construction so you can move without destroying years of work. Keep detailed spreadsheets of everything on the layout for the sake of your heirs. I feel I could go on and on.

Photos by Jay Beckham and Wilbur Snyder

Loads In, Empties Out

From Rich Randall

I have a double-sided backdrop on my layout where there will eventually be a “Loads In – Empties Out” function. The St. Maries side has a plywood mill, currently in place, which will receive empty bulkhead flatcars and produce loaded cars. The door will be a rollup type.

On the other side of the backdrop, Marengo, there will be a plant of some kind that receives loaded bulkhead flatcars and produces empty cars. I was looking for a quick way to put a building in place on the Marengo side. I was constrained by existing trackage.

Rummaging through my stuff, I came across a Broadway Limited Cannery kit. I had three of these at one time since they are very flexible. The kit has material to build a factory with corrugated sides and roof, using plenty of heavy styrene sheets, factory windows, and aluminum corrugated siding strips.

So I devised a way to place the building on an angle so that a single car could be placed inside.

 

It took quite a bit of trial and error to create a design that would clear the cars adequately. I used miscellaneous plastic pieces to strengthen the styrene joints.

The conventional swing doors are made of wood and will be operated by some kind of screw mechanism attached to the tops of each door. This will be a subject of a future exercise.

I weathered the structure, but maybe too much.

Master Builder – Scenery

From Jane Clarke

South Mountain Division Achievement Coordinator Jane Clarke reports that John Pursell of Chambersburg, PA received his Master Builder – Scenery certificate this past year. To earn this John demonstrated “the prototypical rendering of scenic effects from the ground up” on his layout. John has been a frequent contributor to the newsletter. His efforts at home and at the Cumberland Valley Model Railroad Club have graced the covers of Wheel Report editions last winter and spring. Pursell’s HO scale 12 x 28” layout is around-the-walls construction, using L-girder and plywood, set at a height of 53”, and operated with MRC DCC. The backdrop is painted hardboard and the scenery is on foam with a glue shell. Based in the 1950s, the layout depicts the bridge crossings over the Delaware River between Easton, PA, and Phillipsburg, NJ.

Cumberland Valley Yard Sale

The Cumberland Valley Model Railroad Club will be holding a model train yard sale on Saturday, 19 June, in the parking lot of the clubhouse at 440 Nelson St, Chambersburg, PA.

They have items in all scales [engines, rolling stock, structures, scenery materials, tinplate].

Hours are 8:00 AM until roughly 1:00 PM, WEATHER PERMITTING If it rains, we don’t sell trains!

Additionally, if any SMD member has some of their own things to sell, they are welcome to set up a table. The club will have plenty of room.  You must provide your own table and cashbox. 

SMD members should contact the club at (717) 263-6447 and ask for SMD member John Pursell. [contact SMD at southmountaindiv@gmail.com and we will help you get in touch with John. -ed.]

What’s on Your Workbench?

From Don Florwick

Popping into my layout room the other day with no real purpose in mind, I spied a note on one of my staging yard switch panels. The note was reminding me to relabel the panel to clear up an inconsistency between adjacent yard panels.

I have three staging yards (left) along one wall of my layout room stacked one above the other and the 4-yard panels for the three staging yards are similar for each yard. Each panel has a rotary switch to choose the proper staging track. This makes picking a staging track pretty straight forward for my operating crews at the Pittsburgh & South Pennsylvania (P&SP) RR.

So why the note? It seems that for some reason unbeknown to me, I labeled this panel for the middle yard, Wheeling Staging, showing yard track #1 on the wall side of the shelf, whereas the other two yards had track #1 as the first track on the aisle side of the shelf. This inconsistency had not caused major problems but it had caused confusion from time to time if an operator failed to look at the yard panel track diagram before picking their track with the rotary switch, hence the note to self to fix it someday.

I try to remove inconsistencies from my railroad’s infrastructure when I see they create confusion. Operators are busy enough minding their schedule and deciding whether they have the authority to make their movement. 

Making the change was rather easy. I used a piece of an old credit card to remove the dry transfer labeling (left) from the track and rotary switch areas and I repainted the rotary switch area.

I waited a day to let the new paint around the rotary switch area dry. The dry transfers were applied and then over-sprayed with dull cote (below) to protect them.

Total time to make the change; about two hours of puttering around. Another inconsistency was cleared from the P&SP.